Webster Police Department

Municipal / Public Safety
Architect The Lawrence Associates
Size 22,000 sq.ft.
Cost $12,000,000

CES provided full MEP engineering design services for the construction of a new police headquarters building. Estimated costs are $8.2 million for the police station and $3.8 million for the renovation of the fire-rescue station.

The building’s central plant consists of a gas fired boiler plant, which provides the heating needs for the entire facility. A new web internet accessible Building Management System was installed to control the mechanical and select electrical systems. Electrical systems include an emergency generator and an addressable fire alarm control panel with voice evacuation and automatic dialer. Lighting fixtures include high performance recessed fixtures throughout with LED emergency signage.